                                    HSBC Bank, Pwllheli, Wales.
 
                                    The whole building required the brick
                                    and stone work to be repaired and
                                    re-pointed. All defective bricks were
                                    replaced, all old mortar raked out
                                    and re-pointed in lime mortar.
                                    The crumbling ballasters were
                                    carefully taken out, along with the
                                    defective ironwork, and replaced 
                                    with new stainless steel fixings and
                                    stoke ground ballasters.
                                    Cramping of copings with stainless
                                    steel fixtures.
                                    The chimney pots were replaced 
                                    and flaunching to the top of the
                                    chimney stacks. 